Dec 2016 
As on photos of construction updates,  The project already built 4th floor. Construction is progressing rapidly as planned. Expected to be completed by a certain date. The expecting to complete in September 2017. For updates units available please call us on +6699-005-7745 or send an email...

Dec 2016 
As it can be seen from the photos from the construction site updated by the developer: The Construction Update for Whale Marina Condo (August 4 - August 8)   The Construction is going according to schedule. - Second floor concrete is poured. - Piling for swimming pool is completed....

Aug 2016 
As of June 2016, finishing pouring concreate for the mat foundation and 6% on footing. They are currently starting 2% with the main structure, expecting to complete in December 2018. Staff levels are at the maximum required for the works now.  The construction is under controlled of Pre Build c...

Jun 2016 
The construction has begun and is progressing according to plan. On the photos you can see early stages of the construction start. To learn more about this beautiful project in our earlier news feed please go here. For more information and updated promotion info please contact us on +6682-211-8894...

Jun 2016 
AURORA Pratumnak is an elegant condominium located in one of the most prestigious, rapidly developing neighborhoods in Pattaya - The Pratumnak Cozy beach, on Kasetsin soi 7 just 300 meters from the sea. The Aurora Condo is an 8-storey building with 117 units. Highly modern amenities of the pro...

Jun 2016 
As it can be seen from the photos from the construction site updated by the developer: The Construction Update for Whale Marina Condo (May 20 - 28) - Piling for Building A is now 100% Complete - Piles are being exposed out of the ground & cut - Footings are now being made - Suppor...

May 2016 
The main structure has reached 27 floors from a total of 38 floors in the building. Construction is going at a fast pace and the developer plans a building commissioning in the 2nd quarter of the next year. Buyers are to choose from well-equipped one-bedroom apartments, two-bedroom apartments ...

May 2016 
  Construction Update from The Cloud Project:  The structure of this 20-storey building was completed in the end of April 2016.All works involving the systems and interiors are on process as well as the work for the building exterior. For more information and updated promotion inf...

May 2016 
The update from Developer, as it can be seen from the photos,  The first stage of construction of this one of a kind high rise condominium in the center of the city is already complete.Global Top Group team is preparing for the next stage of construction which is building the floor levels of t...